Following is a list of projects that DDDG Engineering Services has been involved with, either wholly or in conjunction with others.
Plant Lighting Retrofit | $55k |
Power System Documentation | $5k |
Sterilzer Electrical Design | $300k |
Co-ordination of Design & Build of Production Line | $2000k |
Shear Controls Upgrade | $30k |
Filter Testing Machine | $80k |
Converting Optimization Team | $50k |
Powder Dump Room Upgrade | $150k |
Oil Blend Upgrade | $200k |
Oven Expansion Project | $150k |
Penny Machine Prototypes | $80k |
Hazardous Food Process | $4000k |
Inspection Station Design Build | $30k |
Foaming Fixture Design Build | $65k |
Industrial Building Expansion | $500k |
Fixturing Design Build | $35k |
Process Simulation | $40k |
Commercial Building | $750k |
![500 Slip Floating Dock](https://dddg.ca/wp-content/uploads/2023/08/500-Slip-Floating-Dock.jpg)
![New 5 MVA Substation at Manufacturing Facility](https://dddg.ca/wp-content/uploads/2023/08/New-5-MVA-Substation-at-Manufacturing-Facility.jpg)
![New Electrical Service](https://dddg.ca/wp-content/uploads/2023/08/New-Electrical-Service-1024x768.jpg)
![Replace Complex Compactors](https://dddg.ca/wp-content/uploads/2023/08/Replace-Complex-Compactors.jpg)
![Develop Lab Process to Pilot Plant](https://dddg.ca/wp-content/uploads/2023/08/Study-Robot-Safety-Controls.jpg)
![](https://dddg.ca/wp-content/uploads/2023/08/Develop-Lab-Process-to-Pilot-Plant.jpg)
![Food Process Control System](https://dddg.ca/wp-content/uploads/2023/08/Food-Process-Control-System.jpg)
![Tank Farm Instrumentation and Controls](https://dddg.ca/wp-content/uploads/2023/08/Tank-Farm-Instrumentation-and-Controls-1024x767.jpg)
![Designed Pan for Lung Association’s Record Size Omelette](https://dddg.ca/wp-content/uploads/2023/08/Designed-Pan-for-Lung-Associations-Record-Size-Omelette.jpg)
![Pre-Start Health & Safety Guarding](https://dddg.ca/wp-content/uploads/2023/08/Pre-Start-Health-Safety-Guarding.jpg)
![Design Build of Roll Loader](https://dddg.ca/wp-content/uploads/2023/08/Design-Build-of-Roll-Loader.jpg)
![Refrigeration Plant Building](https://dddg.ca/wp-content/uploads/2023/08/Refrigeration-Plant-Building.jpg)
![Process Instrumentation and Controls 2](https://dddg.ca/wp-content/uploads/2023/08/Process-Instrumentation-and-Controls-2.jpg)
![Process Instrumentation and Controls](https://dddg.ca/wp-content/uploads/2023/08/Process-Instrumentation-and-Controls.jpg)